MINUTES OF THE 1416TH MEETING OF THE DELHI URBAN ART COMMISSION HELD ON WEDNESDAY DECEMBER 28, 2016.

A. The minutes of the 1415th meeting of the Commission held on 14.12.2016 were confirmed and approved.

B. Projects proposal
SL. No. PROPOSAL OBSERVATIONS /SUGGESTIONS DECISION REMARKS
B. Action Taken Report in respect of Minutes of 1414th meeting held on November 23, 2016.

The Action Taken Report on the minutes of the 1414th meeting of the Commission held on November 23, 2016 was tabled.

Noted by the Commission.

C. Project proposals 

1(i) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -03 PLOT NO A1/3 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • Blocking of EWS blocks should be opened up.
  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Observations given
1(ii) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -06 PLOT NO A2/2 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Approved with observations
1(iii) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -07 PLOT NO A4/1 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Approved with observations
1(iv) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -09 PLOT NO A3/1 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Approved with observations
1(v) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -11 PLOT NO A3/2 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • So as to achieve continuity of open spaces, two central blocks be relocated.
  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Observations given
1(vi) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK POCKET -13 PLOT NO A3/3 SECTOR -A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Approved with observations
1(vii) LAYOUT AND BUILDING PLANS IN R/O 3 BHK AND 2 BHK HOUSING AT POCKET 4 PLOT NO A1/2 SECTOR - A1 TO A4 NARELA.

The proposal forwarded by the DDA was scrutinized and the following observations were made:

  • The environment sustainability study report should be submitted
  • All service equipments at terrace level should be properly camouflaged.
  • Elevations should be worked out in such a manner that there are no hangouts on facades.
  • Hard top surfaces to be minimised and consolidated open green spaces to be increased. Parking along streets to be avoided.
Approved with observations
2 PLANS IN RESPECT OF DEMOLITION AND RECONSTRUCTION IN RESIDENTIAL BUILDING AT PLOT NO 200 GOLF LINK

The proposal forwarded by the NDMC was found acceptable with the observations that the parking should be provided within the plot and should not spill over to the public street.

Approved
3 COMPLETION PLANS IN R/O SARGODHA VIHAR CO-OP. GROUP HOUSING SOCIETY AT PLOT NO -13 SECTOR -07 DWARKA.
  1. The proposal was forwarded by the DDA for consideration of the Commission.        
  2. The building plans of the proposal were approved by the Commission at its meeting held on June 23, 1995.
  3. The completion plans proposal was found acceptable with the observations that more number of site photographs to be submitted. 
NOC approved with observations
4 COMPLETION PLANS IN R/O SHRI GANINATH C.G.H.S. LTD AT PLOT NO -01 SECTOR -05 DWARKA.
  1. The proposal was forwarded by the DDA for consideration of the Commission.        
  2. The building plans of the proposal were approved by the Commission at its meeting held on August 10, 2011.
  3. The completion plans proposal was found acceptable.
NOC
5 LAYOUT PLAN IN R/O EWS HOUSING FOR SLUM DWELLERS AT TIKRI KALLAN.

The proposal was forwarded by the North DMC with the following comments in proforma :

“The work is already in progress. The structures of all blocks have been taken up.”

2. The correspondence held in the matter with the local body and proponents was placed before the Commission.

3. The Commission expressed its displeasure on the aspect of constructions been taken up without prior approval of the Commission. The Commission decided to ask the proponents to give a written commitment that this will not be repeated in future.

In so far as the layout plan of the proposal was concerned, it was found acceptable. 

Approved with observations

D. Additonal items

1 Plans in respect of Delhi Public School, R.K. Puram. (Online)

The proposal forwarded by the South DMC was found acceptable with the following suggestions:

  • Zoning for public art should be taken care.
  • Proper screening of service equipments at terrace to be ensured.
Approved

Shri Samir Mathur, Member DUAC recused  himself during the consideration of the proposal.

 List of participants at meeting of the Commission held on December 28, 2016

(A) Delhi Urban Art Commission

1.       Prof. Dr. P.S.N. Rao, Chairman

2.       Smt. Sonali Bhagwati, Member DUAC

3.       Shri Samir Mathur, Member DUAC

4.       Smt. Sonali Rastogi, Member DUAC