MINUTES OF THE 1415TH MEETING OF THE DELHI URBAN ART COMMISSION HELD ON WEDNESDAY DECEMBER 14, 2016.
  1. The minutes of the 1414th meeting of the Commission held on 23.11.2016 were confirmed and approved.
B. Projects proposal
SL. No. PROPOSAL OBSERVATIONS /SUGGESTIONS DECISION REMARKS
B. Action Taken Report in respect of Minutes of 1413th meeting held on October 26, 2016.

The Action Taken Report on the minutes of the 1413th meeting of the Commission held on October 26, 2016 was tabled.

Noted by the Commission.

C. Project Proposals 

1 ADDITIONS / ALTERATIONS IN EXISTING MOTEL BUILDING AT KHASRA NO 44/22/1MIN, 44/19MIN, 44/22/4, 44/22/7, 44/22/6, 44/22/2,44/22/5,44/22/1SITUATED AT VILLAGE KAPASHERA.

The proposal forwarded by the South DMC was scrutinized and the following observations were made :
1. Architectural expressions need to be improved.
2. Hard top surfaces to be minimised and consolidated open spaces to be increased.
3. No service equipments should be visible at terrace for which proper screening need to be done.
4. Zoning for public art to be indicated in the drawings.

Approved with observations
2 BUILDING PLANS IN RESPECT OF INTERNATIONAL CRAFT COMPLEX AT PLOT NO.-8,,NELSON MANDELA MARG ,VASANT KUNJ

The proposal forwarded by the South DMC was scrutinized and the following observations were made :
1. No service equipments should be visible at terrace for which proper screening need to be done.
2. Zoning for public art to be indicated in the drawings.

Approved with observations
3 BUILDING PLANS IN RESPECT OF Sr. SECONDARY SCHOOL AT KHASRA NO-221 & 223/2, VILLAGE SINDHORA KALAN, SHAKTI NAGAR.

1. The proposal forwarded by the North DMC was considered by the Commission at its meeting held on September 21, 2016. It was not approved and certain observations were given.
2. The revised proposal was found acceptable with the suggestion that the size of central open courtyard to be increased.

Approved
4 ADDITIONS / ALTERATIONS IN RESPECT OF BUILDING PLANS FOR 200 BEDDED BALAK RAM HOSPITAL AT TIMARPUR.

1. The proposal forwarded by the North DMC was scrutinized and discussed with the architects.
2. The proposal was conceptually approved by the Commission at its meeting held on July 13, 1999.
3. The building plans proposal was found acceptable.

Approved
5 PLANS IN R/O ADDITONS AND ALTERATIONS IN REGAL THEATER AT CONNAUGHT PLACE.

1. The proposal was forwarded by the NDMC for consideration of the Commission.
2. Major additions/alterations in the heritage building have been proposed by converting existing cinema into commercial areas and multiplex with four screens.
3. The proposal was scrutinized and the Commission made the following observations :
• The overall circulation in terms of entry/exit, pedestrian movement need clarity.
• The information about management of services need to be furnished.
• The heritage character of the building should be retained.
• The Commission observed that the architect should submit a heritage conservation report of the proposal with complete documentation.
• So as to assess the heritage aspects of the building, the Commission decided to make a site visit.

Observations given
6 REVISED BUILDING PLANS IN RESPECT OF RESIDENTIAL GROUP HOUSING AT GAUSHALA MARG,KISHAN GANJ

1. The proposal was forwarded by the North DMC for consideration of Commission.
2. The revised layout plan of the complex was approved by the Commission at its meeting held on July 13, 2016.
3. The revised building plans proposal was found acceptable.

Approved
7(i) PLANS IN RESPECT OF HIGH MAST MULTI-FUNCTIONAL GROUND TOWER ANTENNA AT ROSE GARDEN NEAR BHAIRO MANDIR NEHRU PARK, VINAY MARG.

The proposals of High Mast Multifunctional Tower Antennas at various locations in New Delhi areas forwarded by the NDMC were scrutinized in the background of the Commission's earlier observations of March 21, 2007, June 12, 2007 and earlier correspondence with Department of Telecommunications etc. on the subject. The proposals of some of the towers were considered at Commission's meetings held on October 26, 2016 and November 23, 2016.

The proposal was found acceptable.

Approved

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

7(ii) PLANS IN RESPECT OF HIGH MAST MULTI-FUNCTIONAL GROUND TOWER ANTENNA AT NORTH AVENUE 1 ESS ELECTRIC SUB STATION

Not accepted. Need relocation since on sensitive location close to important Avenue.

Observations given

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

7(iii) PLANS IN RESPECT OF HIGH MAST MULTI-FUNCTIONAL GROUND TOWER ANTENNA AT VINAY MARG 12 NO TYPE -1 FLATS.

The proposal was found acceptable.

Approved

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

7(iv) PLANS IN RESPECT OF HIGH MAST MULTI-FUNCTIONAL GROUND TOWER ANTENNA AT SATYA SADAN NDMC NURSERY TOWARDS MAINR ROAD

The proposal was found acceptable. 

The proposal was found acceptable.

Approved

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

7(v) PLANS IN RESPECT OF HIGH MAST MULTI-FUNCTIONAL GROUND TOWER ANTENNA AT TILAK LANE ESS 11 KV

The proposal was found acceptable. 

Approved

The Commission decided to take action in the matter without awaiting confirmation of the minutes of the meeting.

8 COMPLETION PLANS IN RESPECT OF PRISON COMPLEX & HOUSING AT MANDOLI

1. The proposal was forwarded by the East DMC for consideration of the Commission.
2. The building plans of the proposal were approved by the Commission at its meeting held on October 8, 2007.
3. The completion plans proposal was found acceptable with the observations that more number of site photographs need to be submitted to the Commission.

NOC
9 COMPLETION PLANS IN RESPECT OF CROWN CO-OPERATIVE GROUP HOUSING SOCIETY AT PLOT NO.-18B, SEC-7,DWARKA

1. The proposal was forwarded by the DDA for consideration of the Commission.
2. The building plans of the proposal were approved by the Commission at its meeting held on March 19, 2001.
3. The completion plans proposal was found acceptable.

NOC
10 COMPLETION PLANS IN R/O PLOT NO -10 COMMUNITY CENTRE BLOCK - B AT SHALIMAR BAGH.

1. The proposal was forwarded by the DDA for consideration of the Commission.
2. The building plans of the proposal were approved by the Commission at its meeting held on November 18, 2009.
3. The completion plans proposal was found acceptable with the observations that more number of photographs of work of art done at site need to be submitted to the Commission.

NOC
11 COMPLETION PLANS IN RESPECT OF PLOT NO. 23 - 24 AT S.P MARG

1. The proposal was forwarded by the NDMC for consideration of the Commission.
2. The building plans of the proposal were approved by the Commission at its meeting held on August 18, 2010.
3. The completion plans proposal was found acceptable.

NOC

List of participants at meeting of the Commission held on December 14, 2016

(A) Delhi Urban Art Commission

1. Prof. Dr. P.S.N. Rao, Chairman

2. Smt. Sonali Bhagwati, Member DUAC

3. Shri Samit Mathur, Member DUAC